Sunday, March 31, 2013

Status Report for Week #4

  1. Status Report for Week #4

  2. Tasks Accomplished
    • Completed Android Mock ups (3/25/13, Chris Carey, 2 hours)
    • In-class Cognitive walk-through (3/27/2013, Andrew Filipski, Chris Carey, Salvador Abate, 1 hour)
    • Completed an Android tutorial, created a hello world Android app (3/28/2013, All team members, 1 hour)

  3. Tasks in Progress
    • Identify system components necessary for the application and document them in the Design Document. 3 to 4 hours to finish.
    • All team members should finish setting up their development environment so that they can pull the empty Android project from repository, run it locally, make a minor change, and push that change to the repository for all team members to see.  1 hour to finish.

  4. Tasks Planned for Next Week
    • Peer Review
    • Completing Design Document

  5. Issues
    • Outstanding
      1. Set up Android development environment for all team members
      2. Help members of team learn Git and how to use with Eclipse
    • Any resolved

  1. Metrics
    • Individual Hours for Week 4:
      1. Salvador Abate: 2 hours
      2. Chris Carey: 4 hours
      3. Chris Ketant: 1 hours
      4. Drew Filipski: 2 hours
    • Total Hours for Week 4: 9 hours
    • Total Hours for Project: 62 hours

Sunday, March 24, 2013

Status Report for Week #3


  1. Status Report for Week #3
  2. Tasks Accomplished 
    • Completed User Classes and Profile Characteristics section of SRS document.  All team members reviewed and completed missing sections of user classes.  (3/18/13, All members, 30 minutes)
    • Completed Prototype section of SRS document.  Chris Carey merged his design with Andrew Filipski's design and incorporated team input to generate six prototype screens with captions for the SRS document.  (3/18/13, Chris Carey, 1.5 hours)
    • Completed System Features sections of SRS document.  All team members reviewed system features and added full descriptions.  (3/18/13, All members, 1 hour)
    • Reviewed and revised SRS Document.  All team members reviewed and revised the SRS document.  (3/18/13, All members, 1 hour)
    • Formatted and submitted SRS Document.  Chris Carey and Chris Ketant made document formatting changes for submission.  (3/19/13, Chris Carey and Chris Ketant, 30 minutes)
    • Created development environment.  Created GitHub repository.  Some team members installed the Android SDK with Eclipse.  An empty Android project was created and added to the repository.  (3/24/13, Salvador Abate, Chris Carey, Andrew Filipski, 1.5 hours)
  3. Tasks in Progress
    • All team members should finish setting up their development environment so that they can pull the empty Android project from repository, run it locally, make a minor change, and push that change to the repository for all team members to see.  1 hour to finish.
  4. Tasks Planned for Next Week
    • Identify system components necessary for the application and document them in the Design Document. 3 to 4 hours to finish.
  5. Issues
    1. Outstanding
      • Set up Android development environment for all team members
      • Set up GitHub repository access for all team members
    2. Any resolved
      • Merged prototype sketches into a single, low-fidelity prototype
      • Chose Android 4.0 (API 14) as the target Android platform
  6. Metrics
    • Individual Hours for Week 3:
      1. Salvador Abate: 5 hours
      2. Chris Carey: 6.5 hours
      3. Chris Ketant: 6 hours
      4. Drew Filipski: 6 hours
    • Total Hours for Week 3: 23.5 hours
    • Total Hours for Project: 53 hours